19/05/2012 07:52
 
Search    

 
  Italcementi Group
  Careers
  Sustainable Development
  Media and Communication
  Investor Relations
  Research and Innovation
  Architecture
  Login

 
Our plants
Hydropower plants
 Borgo San Dalmazzo

Introduction
The plant and its outbuildings were built in the 1950s. The main equipment at this plant includes:

  • intake structure and its weir on the Vermenagna stream
  • intake structure on the Roccavione power plant tailrace
  • powerhouse with turbines, generators and control boards.

 
Technical Information

Plant scheme run of river
Region Piemonte
Municipality Borgo San Dalmazzo (CN)
River Gesso and Vermenagna stream
Installed capacity 2.630 kW
Average Flow 6.600 l/s
Head 41,10 m
Turbines 2 horizontal Francis (Riva) (1.315 kW each)
Commissioning 1947
Italcementi Acquisition 1947

Back
Borgo S.Dalmazzo today ...

Borgo S.Dalmazzo yesterday ...



Certifications
Glossary
Hydropower plant
"The operating principle of a hydropower plant is very simple: suitably devised turbines convert the potential energy of water falling from higher elevations downstream through streams, channels, and watercourses, into electric energy. Therefore, hydropower relies primarily on rainwater."

kW kilowatt
l/s Litres per second
m metre
MWh Megawatt hour
m3 cubic metre
a.s.l. above sea level
kVA kilovoltampere
Download certificazioni
Certificazione del Sistema Qualità ISO 9001
Certificazione Ambientale ISO 14001
 
Legal information | Corporate data | System requirements | Site map |  
© 2008 Italgen Copyright - P.IVA 02605580162 
Last update 27/06/2011 14:36:21  UTC