19/05/2012 08:00
 
Search    

 
  Italcementi Group
  Careers
  Sustainable Development
  Media and Communication
  Investor Relations
  Research and Innovation
  Architecture
  Login

 
Our plants
Hydropower plants
 Roccavione

Introduction
The plant and its outbuildings were built in the 1950s.

The main equipment at this plant includes:

  • intake structure and its weir
  • open channel
  • powerhouse with turbines, generators and control boards.

     
    Technical Information

    Plant scheme run of river
    Region Piemonte
    Municipality Roccavione (CN)
    River Gesso
    Installed capacity 1.420 kW
    Average Flow 4.650 l/s
    Head 31,30 m
    Turbines 2 horizontal Francis (Riva) (710 kW each)
    Commissioning 1947
    Italcementi Acquisition 1947

    Back
    Roccavione today ...

    Certifications
    Glossary
    Hydropower plant
    "The operating principle of a hydropower plant is very simple: suitably devised turbines convert the potential energy of water falling from higher elevations downstream through streams, channels, and watercourses, into electric energy. Therefore, hydropower relies primarily on rainwater."

    kW kilowatt
    l/s Litres per second
    m metre
    MWh Megawatt hour
    m3 cubic metre
    a.s.l. above sea level
    kVA kilovoltampere
    Download certificazioni
    Certificazione del Sistema Qualità ISO 9001
    Certificazione Ambientale ISO 14001
     
    Legal information | Corporate data | System requirements | Site map |  
    © 2008 Italgen Copyright - P.IVA 02605580162 
    Last update 27/06/2011 14:36:21  UTC